Blog Post

Stillington Hall Plant Room 

  • by Jason Robinson
  • 01 Oct, 2017
stillington plant room
Stillington Village Hall plant room has now been finished for some time incorporating a Worcester Dansmore utility oil fired boiler with vertical flue auto pressurisation unit dosing pot with a 1" Magnacleanse. The system incorporated three zones with commissioning valve sets  operating on a sealed pressurised system.
by Jason Robinson 10 Feb, 2024
Recently undertaken new boiler installation for ripon cathedral offices as pictured ideal evomax 80 kw freestanding frame low loss header mixing pot 2" mild steel connections with existing circulator and new line strainer , new concrete base flue system and new heating controls nice and warm :) 
by Jason Robinson 31 Jan, 2024
New boiler installation at short notice for an existing customer 
by Jason Robinson 09 Aug, 2023
well works are well underway on phase 2 of the refurb works at oakdale golf club complete strip out and studwork etc within the first week 
by Jason Robinson 28 Jul, 2023
the work that has gone into this refurbishment is unbeleivable structural building works joinery floor construction drainage plastering plumbing electrical lighting entrance door decorating all works undertaken in house and finished to a high standard 
by Jason Robinson 26 Jul, 2023
its a new project we are undertaking the plumbing & heating works to apartments on valley drive 
by Jason Robinson 21 Jul, 2023
recently undertaken some major structural works at oakdale after finding some supports for a chimney upstairs we have had to get structural calculations undertaken and steel fabrications with ourselves undertaking the installation works, A challenge !!
by Jason Robinson 28 Jun, 2023
after being contacted by a local agent they required damaged gas meter Boxes replaced, This was undertaken at short notice with the gas meters re-sealed after installation happy customer. We are qualified to undertake works on any gas system any size domestic commercial industrial  !!
by Jason Robinson 21 Feb, 2023
We are pleased to have won the contract for the refurbishment of the wash room facilities over three phases, As principle contractor we shall be undertaking the majority of works ourselves with the full strip out of existing facilities to include all building, joinery, plastering, electrical, plumbing, to the finished hand over project keep an eye out for future posts.  
by Jason Robinson 21 Feb, 2023
we have recently been awarded the project for supply and installation of suspended commercial heaters at the claas sinderby thirsk site to include commercial heaters pipework and remedial plumbing works. 
by Jason Robinson 16 May, 2022
ongoing bathroom refurb currently ongoing full strip out and re-build watch this space ??
Show More
Share by: